BLD Pulse
- July total construction spending: $2,157.6B SAAR; -3.8% y/y. Census | July 2026 spending
- August broad construction inputs: +1.2% m/m; +8.9% y/y. ABC | August input prices
- August gypsum products: +0.7% m/m and y/y. Yield PRO | August materials
- August copper wire and cable: +4.2% m/m; +27.3% y/y. Yield PRO | August materials
- August single-family starts: 918K SAAR, not the 878K permits series. Census | August 2026 housing
- H1 Atlanta data-center construction: 2,882 MW in CBRE's universe. CBRE | H1 2026 data centers
- Q2 industrial vacancy: 6.5%; absorption 85.1M SF. CBRE | Q2 industrial
- Q2 Reno industrial vacancy: 11.5%; absorption 2.04M SF. NVBEX / Colliers | Reno Q2
Free daily briefing · Pro archive
Get the daily briefing free. Go Pro for the archive.
This recap stays free to read. Subscribe free for the weekday briefing and last week’s Deep Dive. Pro ($99/month or $999/year) unlocks the PDF of this and every past daily issue, the data and the full Deep Dive archive.
This issue's PDF (Pro) · See the Deep Dive · Today's PDF (free)
Executive snapshot
- Cautious Demand is not broad-based: July construction spending was $2,157.6B SAAR, down 3.8% year over year. The 0.5% monthly decline is within the reported ±0.8% uncertainty. Recommendation: set pursuit capacity by sector, not the national headline. Census | July 2026 spending
- Cautious August construction inputs rose 1.2% month over month and 8.9% year over year in ABC's basket. This measures input inflation, not installed bid escalation. Revalidate labor, freight, duties and productivity separately before converting budgets to GMPs. ABC | August input prices
- Positive Data centers remain capacity-constrained: CBRE's primary-market H1 vacancy was 1.4%, and 80.4% of construction was preleased. Demand is strong, but power dates and local approvals still determine whether a parcel becomes a deliverable project. CBRE | H1 2026 data centers
- Positive Atlanta is today's metro focus: CBRE measured 2,882 MW under construction in H1, ahead of Northern Virginia. Underwrite phased energization, commissioning and cost allocation; do not equate a construction pipeline with capacity available to lease. CBRE | H1 2026 data centers
- Cautious Drywall and interior finishes lead the trade focus: August gypsum prices rose 0.7% monthly and annually. Copper wire and cable rose 4.2% monthly and 27.3% annually. Price the wall assembly and its electrical interfaces as separate exposures. Yield PRO | August materials
- Positive Industrial demand is improving selectively: Q2 net absorption was 85.1M SF against 47.9M SF of completions; vacancy fell to 6.5%. DFW, Houston and Phoenix led H1 absorption. Favor tenant-backed packages and modern product over blanket speculative starts. CBRE | Q2 industrial
- Cautious Entitlement risk is live: Charlotte's new-data-center moratorium does not stop already approved projects, including Digital Realty expansions. Separate grandfathered approvals from new applications and confirm each parcel's actual status. Axios Charlotte | September 17
- Neutral Northern Nevada improved, but is not supply-starved: Colliers' Q2 industrial vacancy fell to 11.5% with 2.04M SF absorption. Treat Reno/TRIC logistics and data-center investment as different underwriting cases; a stronger quarter does not erase competing space. NVBEX / Colliers | Reno Q2
Market movers
| Item | Change | Note |
|---|---|---|
| Construction inputs | +1.2% m/m; +8.9% y/y ▲ | August 2026, ABC aggregate. Not a forecast of local installed bids. ABC | August input prices |
| Gypsum products | +0.7% m/m; +0.7% y/y ▲ | August 2026. Check board type, framing gauge, fire/acoustic rating, finish and labor. Yield PRO | August materials |
| Copper wire and cable | +4.2% m/m; +27.3% y/y ▲ | August 2026. Refresh dated supplier quotes before electrical release. Yield PRO | August materials |
| Softwood lumber | -1.9% m/m; +11.8% y/y ▼ | August 2026. Monthly relief is not a return to the prior-year price level. Yield PRO | August materials |
| Contractor backlog | 8.5 months, from 8.0 ▲ | ABC August survey via ENR. Data-center contractors: 9.9 months versus 8.3 for others. ENR | August contractor backlog |
| Housing authorizations | 1.394M SAAR; -2.7% m/m ▼ | August permits; single-family permits 878K. Single-family starts are a different series: 918K. Census | August 2026 housing |
Sector outlooks
| Sector | Outlook | Signal |
|---|---|---|
| Data centers | Positive | H1 primary-market vacancy 1.4%; 80.4% of construction preleased. Power and entitlement remain gating constraints. CBRE | H1 2026 data centers |
| Industrial / logistics | Positive | Q2 absorption 85.1M SF exceeded 47.9M SF completions; vacancy 6.5%. Recovery is not uniform. CBRE | Q2 industrial |
| Public / infrastructure | Neutral | July public spending $543.4B SAAR; highway $150.3B. Monthly movements are within wide sampling uncertainty. Census | July 2026 spending |
| Multifamily | Neutral | Q2 absorption 124,600 units; vacancy 8.9%; deliveries down 27% y/y. Local concessions still govern feasibility. Cushman & Wakefield | Q2 multifamily |
| Single-family | Cautious | August permits 878K; starts 918K SAAR. Starts rose 7.6% m/m, but ±14.0% uncertainty prevents a firm growth claim. Census | August 2026 housing |
| Office / commercial | Cautious | Q2 vacancy 18.3%; prime vacancy 12.3%. Demand recovery supports tenant improvements before broad speculative building. CBRE | Q2 office |
| Retail | Neutral | Q2 retail asking rents $24.79/SF, up 2.4% y/y. Confirm lease structure and local tenant sales before inferring feasibility. CBRE | Q2 sector figures |
| Hospitality | Neutral | Q2 hotel pipeline: 5,975 projects; 1,081 under construction. Early planning is not committed backlog. Lodging Econometrics | Q2 pipeline |
Strategic watchlist
- Texas air permits: San Antonio plaintiffs challenge generator permits; the September 22 report describes allegations, not a court ruling. Verify permit and injunction status before committing mobilization. WOAI | San Antonio permit lawsuit
- Georgia power economics: the Google nuclear-upgrade subscription is proposed and needs PSC approval. Claimed benefits are not guaranteed savings or a project-specific energization commitment. WSB | Georgia nuclear proposal
- Nevada incentives: a legislative committee's proposed 2027 bill is not an enacted statewide data-center ban. Keep incentive and entitlement assumptions conditional. Arizona Capitol Times | September 20
- Hotel conversion opportunity: Q2 conversion pipeline reached 1,567 projects. Screen reuse against code, building systems and brand requirements before assuming a faster path. Lodging Econometrics | Q2 pipeline
Top questions leaders should be asking
- Which pursuits have evidence of tenant commitment, financing, power and permission rather than only a sponsor announcement?
- Where does our estimate separate material-index movement from labor, productivity, freight and contractual escalation?
- Which Atlanta projects have a credible energization and commissioning sequence that matches the construction promise?
- Are our Reno/TRIC underwriting rents and lease-up periods supported by comparable signed leases after concessions?
- What dated permit, utility or market evidence would make us stop, reprice or phase the next investment?
This is an archived issue.
Read today's live briefing or get the full briefing in your inbox every morning — free.
See today's Pulse → Subscribe free